< Back to News
Fri 12 Aug 2011 08:00:02 AM EDTThe $37 million dollar upgrade of the boiler at Howe Sound Pulp and Paper in British Columbia is nearing completion. During the upgrade, the bottom one-third of the boiler was removed and replaced with new advanced technology that uses a fluidized sand bed to burn waste bark. As well, a heat recovery device was installed [...]
Posted by ForestTalk.com
Go to the Original Article